Kitchen ventilation projects and extraction cleaning enquiries
DW172 kitchen ventilation: a guide for owners and managers
DW172 mentioned in your kitchen project or survey?
Keep the design question and cleaning work clearly defined.
Agree the cleaning scope, access and records before booking.
Use this guide to understand where a ventilation design appointment differs from a kitchen extraction clean. If the project needs cleaning, discuss the existing canopy, ducts and fan, planned changes and hand-back date. The responding business confirms the work it can provide, any survey needed and its quotation; design or construction questions retain their own specialist scope.
Explore UK coverage, Scotland, Wales and Northern Ireland.
Guidance for DW172 ventilation design and building access.

Discuss extraction cleaning for your kitchen project
Enter your name, site postcode, phone number and email address. Mention the project, finding or target date if useful; you do not need a completed technical brief or drawings to enquire.
We use your details to respond and arrange follow-up with a cleaning business. About the service.
Use the BESA DW/172 kitchen ventilation specification for the published technical reference. BESA’s listing also identifies its May 2024 addendum concerning fire-resisting and smoke-control ductwork. Ask your designer or specialist to confirm the applicable documents.
What is DW172?
DW/172 is an industry specification covering commercial kitchen ventilation. It is not legislation. A project may refer to it alongside applicable legal, building, contractual and other technical requirements, which the responsible specialists should identify.
Why does it appear in a kitchen project?
The ventilation brief needs to reflect the cooking operation and the system that will serve it. Ask who is responsible for design, installation and verification, and which deliverables are included in their appointments. Keep the agreed brief available for future maintenance.
Discuss access before work is finalised
Discuss how the cleaning and maintenance team will reach the retained ducts and fan components before the route or equipment is finalised. Identify any separate access work and approval dependencies in the project proposal.
Use the access-panel planning checklist to prepare the discussion.
Refer duct-construction concerns to a specialist
If a report raises a concern about construction or fire resistance, retain the exact wording and request the appropriate assessment. Do not assume a clean or a new access panel resolves the wider issue. See assessment preparation guidance.
How is this different from TR19 Grease?
DW172 concerns kitchen ventilation systems; BESA TR19 Grease specification addresses grease accumulation and extraction hygiene. Ask which question your appointment will answer. For the cleaning service itself, use TR19 Grease extraction cleaning enquiries.
Are you refitting or changing the cooking operation?
Tell your designer and relevant specialists about proposed equipment, menu, hours and layout changes before decisions are finalised. Keep the maintenance team informed. The changing-use planning guide helps organise the inspection and cleaning discussion.
Does the route pass through a shared building?
Identify access controls, tenancy boundaries and existing drawings. Use the landlord and riser planning guide where several parties are involved. Confirm who can approve work and who will hold the updated records.
What does an insurer or landlord need to see?
Ask for the actual document or action requested and identify which specialist can provide it. A reference to DW172 does not mean a cleaning certificate answers a design question. Use the records checklist to organise separate evidence.
Include the system in ongoing maintenance
Pass the final system information, access details and relevant instructions to the maintenance team. Our SFG20 planning guide helps connect the asset record, cleaning appointments and outstanding actions.
If an existing system needs remedial work
Obtain a defined finding and scope rather than a general promise to make the system compliant. Identify design, access, repair and cleaning tasks separately. Compare proposals with the quotation checklist.
Prepare the information for your enquiry
- Site postcode and type of kitchen.
- The survey finding or project requirement.
- Any existing drawings, reports and access limitations.
- Proposed change, work window and decision deadline.
For regional information, see UK kitchen cleaning coverage. The site postcode, scope and contractor availability are checked before a booking is agreed.