Menu Close

TR19® Grease cleaning from quotation to handover

The kitchen extract cleaning process

Booking kitchen extraction cleaning for the first time?
Get the system, working window and records defined.
Agree the quotation before confirming the cleaning visit.

Arrange kitchen extract cleaning with a clear process from the first enquiry to the completion records. Discuss the canopy, connected ducts and fan, access and shutdown before booking. The agreed handover should identify the work undertaken, photographs and verification findings, with exclusions or remaining actions recorded.

Kitchen and extraction canopy at Park Manor Care Home, Poole, from the historic EC Cleaners archive
Define the connected extraction route before agreeing the cleaning visit. Kitchen and canopy at Park Manor Care Home, Poole, from the historic EC Cleaners archive, shown as equipment context.

Start the cleaning enquiry that fits your kitchen

Your first clean or a new quotation

Enquire about TR19® Grease cleaning for the canopy, connected ducts and fan serving your kitchen. Discuss the system and available work window, with any survey needed for pricing, included sections and completion records confirmed in the quotation before booking.

Get a kitchen extract cleaning quote
TR19 kitchen extract cleaning scope

Preparing a kitchen for the cleaning visit

Arrange a cleaning enquiry around service hours, site entry and access to remote ductwork or plant. Discuss the work window and any separate access arrangements before attendance, with kitchen hand-back and the included work clearly agreed with the cleaning business.

Discuss your kitchen cleaning arrangements
Kitchen ductwork access and cleaning

Follow-up work after an incomplete clean

Enquire about a visit to address sections left uncleaned or excluded from earlier work. Discuss the affected location and access restriction, with the proposed cleaning and new photographs and reporting linked to the outstanding action and any limitations that remain.

Discuss follow-up extraction cleaning
Kitchen extraction post-clean reports

Get a kitchen extract cleaning quote

Start with your site postcode and contact details. Add a preferred date or describe what needs attention if useful; you do not need to complete this guide or gather technical documents before enquiring.

Contact Us

Please enter your name, site postcode, phone number and email address so we can respond to your enquiry.

Prefer to talk? Call 07849 274 799.

What should be agreed before the cleaning visit?

The initial discussion identifies the kitchen and requirement. A survey may be needed where route, condition or access cannot be established from available information.

  • Instruction: the included canopy, ducts, fan and discharge, with exclusions.
  • Access: who can arrange entry and any further provision needed.
  • Work window: kitchen release, relevant system arrangements and return to use.
  • Handover: the report, images, verification and certification included.

The appointed business determines its work method for the actual system. This is a buyer’s guide, not instructions for carrying out duct cleaning yourself.

What should remain clear while the work is underway?

The work should follow the agreed route and components. If a section cannot be reached or circumstances differ from the proposal, the limitation and any recommended next step need recording.

Canopy work, internal duct coverage and the fan/discharge should remain identifiable. A photograph of the cooking line alone does not describe the full appointment.

Equipment faults or proposed building changes should not silently become part of a cleaning instruction. Their purpose and any additional decision need to be clear.

What if the required work changes?

Agree how new findings or additional work will be explained and authorised. Identify whether the proposal needs revising, another assessment or separate access arrangements.

Confirm the effect on price, timing, catering hand-back and reporting rather than assume every discovered issue is covered by the original total.

Start an enquiry before all these details are settled. They are topics for planning, not an entry checklist.

What should happen at handover?

Work record
The site, system, date, attending business and scope completed.
Supporting evidence
Before-and-after images and verification methods, locations and findings.
Limitations
Unreached or excluded sections, reasons and recommended follow-up.
Next review
The maintenance recommendation and the person retaining and acting on the record.

Keep the full report with the certificate and original instruction.

Does the process end with a report or with a usable next action?

If the visit leaves an unresolved section, is someone responsible for taking the recorded recommendation forward?

Tell us about new work or a previous finding. Existing documents can follow if available.

What happens when you contact us?

  1. Start the conversationEnter contact details and postcode. Describe what prompted the enquiry if useful.
  2. Plan the actual appointmentDiscuss system scope, access and timing with the proposed business.
  3. Review the proposalAgree the work and handover before booking, including how changes are authorised.

Kitchen Extraction Evidence is operated by Search And Submit Limited. We arrange introductions to cleaning businesses, which provide quotations, carry out the agreed work and supply the completion records. How the service works.

Questions about the cleaning process

Do we have to complete this guide before enquiring?

No. A short initial enquiry is enough; planning details can follow.

Is a survey always required?

That depends on what can be established about the system, condition and access.

Who decides the cleaning method?

The appointed business should determine its method for the actual work and site arrangements.

Does the process include fan repair or alterations?

Not automatically. Keep those requirements separately identified and agreed.

What if work remains incomplete?

The record should identify coverage, the limitation and recommended follow-up rather than imply everything was completed.