Kitchen ventilation cleaning, maintenance and design enquiries
TR19, SFG20 and DW172: which task does each support?
Asked for TR19, DW172 or maintenance records?
Start with the system and the work you need arranged.
Agree the appropriate scope, price and records before booking.
Discuss a cleaning requirement, ventilation project or maintenance-planning request without preparing a technical brief first. The responding business confirms which services it can provide, what further information is needed and the proposed appointment. Keep grease cleaning, general-air hygiene, design and maintenance tasks clear so each quotation and handover describes the actual work.
Explore UK coverage, Scotland, Wales and Northern Ireland.
Guidance for TR19 Air cleaning and DW172 kitchen ventilation.

Discuss the ventilation service your site needs
Enter your name, site postcode, phone number and email address. A short description of the task or request is useful; the relevant system, specification and documents can be clarified during follow-up.
We use your details to respond and arrange follow-up with a relevant business. About the service.

- TR19 Grease: grease hygiene in kitchen extraction systems.
- TR19 Air: internal cleanliness of general ventilation systems.
- SFG20: a framework of maintenance tasks and schedules.
- DW172: a specification for commercial kitchen ventilation systems.
The relevant scope should be identified by the appointed specialist. A reference to all four does not turn one visit into a complete building compliance service.
When the request comes from an insurer or landlord
Find out what document and system the request concerns. A grease-cleaning report, an asset maintenance record and a ventilation design document answer different questions.
Use the insurance evidence guide to prepare the request and extraction documentation guidance to organise the records.
Use TR19 Grease for kitchen extraction hygiene
For grease deposits in the canopy and extract route, describe the system and ask for the proposed inspection or cleaning scope. Confirm how access limitations and completion evidence will be reported.
Read TR19 Grease explained or go to the grease cleaning enquiry page.
Use DW172 for ventilation specification questions
If equipment is changing, access is being designed or the duct route is being altered, explain the project to an appropriate ventilation specialist. A cleaning quotation is not a design review.
Our DW172 guide for owners and managers helps prepare the brief. Consult the kitchen ventilation design guide for further context.
Use TR19 Air for general ventilation hygiene
Identify the ventilation system and areas served so the provider can distinguish general air systems from grease extraction. Ask what the hygiene report will cover and which parts may be inaccessible.
See TR19 Air certificates and reports and TR19 Air service enquiries.
Use SFG20 to organise maintenance tasks
A maintenance plan can bring tasks together against the relevant assets, with named owners and recorded outcomes. The site-specific plan still needs suitable expertise and the applicable requirements considered.
Read SFG20 and kitchen maintenance planning. We do not reproduce licensed maintenance schedules on this website.
Can you enquire without a technical brief?
- A short description of the cleaning need is enough to begin.
- Any relevant standard or request can be clarified with the contractor.
- Access and working arrangements can be discussed before booking.
- The contractor should explain assumptions, exclusions and any survey requirement.
- The contractor can confirm the reporting available with the service.
Use the quotation comparison guide to compare the same scope.
Common questions before you book
Do I need all four? That depends on the tasks and systems involved; ask the relevant specialist to explain their proposed scope.
Will one certificate cover everything? Each record needs to describe the work it supports. Do not assume it covers unrelated systems, design or wider premises duties.
Can one provider coordinate several tasks? Ask them to identify the expertise, appointments and reports involved, including anything supplied by another party.
Where can you find the original technical specifications?
The publishers are the starting point for the specifications and maintenance framework: BESA TR19 Grease, BESA ventilation cleanliness, BESA DW172 and SFG20.
For a practical coordination approach, use our kitchen ventilation maintenance guide.
Which document should you ask for after the work?
For a TR19 Grease cleaning appointment, the handover should identify the kitchen extraction system, the areas cleaned, relevant photographs or findings and any sections that could not be reached. A TR19 Air hygiene report should instead identify the ventilation assets assessed and the scope of its hygiene work. Neither document proves that an altered kitchen ventilation design meets DW172.
A maintenance programme informed by SFG20 records when tasks are due and completed, but it is not itself evidence that a particular duct was cleaned. When several documents are requested, match each one to the exact system and decision it supports.
How do you avoid booking the wrong appointment?
If the kitchen is trading and the issue is grease in the extract route, start with TR19 Grease cleaning. If the concern is general supply or extract air hygiene outside the cooking grease system, use TR19 Air. A change to airflow, duct routing or appliance layout calls for competent design advice; the cleaning appointment should not be described as design certification.